
Carrying out structural repairs to the damaged base of the DCI-2 drilling rig in the platform's operational position (This
operation is one of the most complex and difficult repair operations on offshore platforms, which has never been done
before in the country. By conducting a very complex engineering analysis and gathering the most skilled experts and
specialists in similar repairs abroad, it was successfully completed by the all-Iranian team of Negin Moj Adak
Company, with the lowest cost and time)
Supply of materials, construction and replacement of 52-inch sea chests along with 36-inch main inlet line for Davar
super tanker at sea with full load capacity 25 meters below the waterline


Vestibulum arcu erat, imperdiet eu ex at, porta porttitor leo. Morbi auctor, sapien et gravida euismod, nisi justo ornare odio, id condimentum massa risus convallis ante. Ut venenatis arcu fermentum dictum ullamcorper. Aenean non ante id enim ornare luctus. Etiam pulvinar ipsum in convallis dignissim.
Vestibulum arcu erat, imperdiet eu ex at, porta porttitor leo. Morbi auctor, sapien et gravida euismod, nisi justo ornare odio, id condimentum massa risus convallis ante. Ut venenatis arcu fermentum dictum ullamcorper. Aenean non ante id enim ornare luctus. Etiam pulvinar ipsum in convallis dignissim.







